Clelands completed the seismic strengthening and refurbishment of Transpower’s substation. As part of New Zealand’s national power grid, this facility plays a vital role in keeping electricity flowing to the Taranaki region. The project focused on ensuring the substation can continue to operate safely and reliably in the event of an earthquake.
Engaged as head contractor, Clelands managed the complex strengthening and refurbishment works while maintaining full site safety and operational continuity. We worked in close collaboration with Transpower, WSP engineers, and architectural consultants to achieve a resilient and durable outcome.